First off Inspection Chamber

Summary

<

Our demarcation (first off) Inspection Chamber can be constructed within 1 metre of the a plot boundary to delineate change of ownership.
The demarcation chamber may be adopted by the Sewage Undertaker. And is also manufactured to BS EN 13598-2.

Key Benefits

  • Fully sealed for a water tight, tamper proof and low maintenance installation
  • Light in weight and strong for improved health and safety and easier handling
  • Chemical & corrosion resistant
  • Kitemarked to BS EN 13598-2
  • High strength single piece 450mm Ridgisewer SN8 riser
  • Versatile and available with inlets for 150m Polysewer and 160mm/110mm BS EN 1401 or BS EN 13476:2

 

To find out more about our new SFAR chamber range and the best procedures for installation visit the Polypipe Building Products Blog



Literature & technical info

View all
View Products

First off Inspection Chamber products

Get in touch Find a stockist

Filter products

Adaptor

CODE NO. Size & length Colour Pack qty BOX QTY
IC6PS6 150MM 1 Full details >
POLYPIPE Adaptor 150MM
IC6UG6 160MM 1 Full details >
Adaptor 160MM
IC6PS10 225MM 1 Full details >
POLYPIPE Adaptor 225MM
IC6UG10 250MM 1 Full details >
POLYPIPE Adaptor 250MM

Seal

CODE NO. Size & length Colour Pack qty BOX QTY
SRSW4508 450MM 1 Full details >
POLYPIPE Seal 450MM
SRSW6008 600MM 1 Full details >
POLYPIPE Seal 600MM

Cap

CODE NO. Size & length Colour Pack qty BOX QTY
SFARC 1 Full details >
POLYPIPE Cap
IC6EC6 150MM 1 Full details >
POLYPIPE Cap 150MM
IC6EC10 225MM 1 Full details >
POLYPIPE Cap 225MM

Chamber Base

CODE NO. Size & length Colour Pack qty BOX QTY
SFARB3 110MM 1 Full details >
POLYPIPE Chamber Base 110MM